One board. A complete connection.
A conceptual replacement sequence showing the questions to resolve before disturbing a board.
SELECTIVE REPLACEMENT
Follow the connection.
A conceptual sequence. It does not specify fastening, spans, structural repair or a removal method.

Illustration · Resolve actual fasteners, profile, support and condition before work.
Evidence behind the workflow
Visualizations organize observations. The actual product label, coating history and on-site assessment control the work. No image establishes species identity, moisture readiness, chemical compatibility or structural condition.
Build a condition-based care plan ↗Continue the study
The restoration studio
Explore one deck through surface conditions, inspection and two different appearance goals.
What am I looking at?
Move from the full deck to a board and surface detail. Compare visual clues without treating them as a diagnosis.
A gray deck can still be your goal.
Compare naturally weathered, dirty and cleaned-gray Ipe appearance scenarios.
Restore color. Respect the sequence.
Explore assessment, cleaning, drying, preparation and optional finishing on the same reference deck.